INFORMATION OBJECTIVES
The Developer first needs summary
information to scope the technical analysis and commercial structure and alternatives
suitable for a BOO project. Two studies are conducted in parallel :
 | Power Output Simulation
|
 | Financing Analysis /
Sensitivities
|
Once these have converged on a
satisfactory option, then a memorandum of understanding would be agreed laying out the
framework of the key terms, conditions, and specifications. This is then firmed up into :
 | Power Supply Offer
|
 | Technical Supply Specification
|
 | Turnkey Contract Outline
|
Once these are agreed, the suite of documents are put into place in preparation for the
Bankers Information Memorandum drafting.
|